[Federal Register Volume 85, Number 36 (Monday, February 24, 2020)]
[Notices]
[Pages 10458-10460]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2020-03554]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

[FWS-R4-ES-2020-N014; FVHC98220410150-XXX-FF04H00000]


Deepwater Horizon Oil Spill Final Restoration Plan #1.3 and 
Environmental Assessment: Rabbit Island Restoration and Shoreline 
Protection at Jean Lafitte Historical National Park and Preserve and 
Finding of No Significant Impact; Louisiana Trustee Implementation 
Group

AGENCY: Department of the Interior.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: In accordance with the Oil Pollution Act of 1990 (OPA), the 
National Environmental Policy Act of 1969 (NEPA), the Final 
Programmatic Damage Assessment Restoration Plan and Final Programmatic 
Environmental Impact Statement (Final PDARP/PEIS), and the Consent 
Decree, the Federal and

[[Page 10459]]

State natural resource trustee agencies for the Louisiana Trustee 
Implementation Group (LA TIG) have prepared the Louisiana Trustee 
Implementation Group Final Phase 2 Restoration Plan/Environmental 
Assessment #1.3:Rabbit Island Restoration and Shoreline Protection at 
Jean Lafitte Historical National Park and Preserve (Phase 2 RP/EA #1.3) 
and Finding of No Significant Impact (FONSI), approving construction 
activities for the restoration of habitats on federally managed lands 
and birds injured in the Louisiana Restoration Area as a result of the 
Deepwater Horizon (DWH) oil spill. The Phase 2 RP/EA #1.3 analyzes 
restoration project design alternatives for two projects, which were 
approved for engineering and design (E&D) in a previous restoration 
plan. In the final Phase 2 RP/EA #1.3, the LA TIG selected and approved 
a design alternative for construction of each, at a total approximate 
cost of $36,048,500. The purpose of this notice is to inform the public 
of the availability of the final Phase 2 RP/EA #1.3 and FONSI.


ADDRESSES: 
    Obtaining Documents: You may download the Phase 2 RP/EA #1.3 from 
either of the following websites:
     https://www.doi.gov/deepwaterhorizon.
     https://www.gulfspillrestoration.noaa.gov/restoration-areas/louisiana.
    Alternatively, you may request a CD of the Phase 2 RP/EA #1.3 (see 
FOR FURTHER INFORMATION CONTACT). A hard copy of the Phase 2 RP/EA #1.3 
is also available for public review at the locations listed in the 
following table.

----------------------------------------------------------------------------------------------------------------
                 Library                            Address                      City                   Zip
----------------------------------------------------------------------------------------------------------------
St. Tammany Parish Library..............  310 W 21st Avenue.........  Covington.................           70433
Terrebonne Parish Library...............  151 Library Drive.........  Houma.....................           70360
New Orleans Public Library, Louisiana     219 Loyola Avenue.........  New Orleans...............           70112
 Division.
East Baton Rouge Parish Library.........  7711 Goodwood Boulevard...  Baton Rouge...............           70806
Jefferson Parish Library, East Bank       4747 W Napoleon Avenue....  Metairie..................           70001
 Regional Library.
Jefferson Parish Library, West Bank       2751 Manhattan Boulevard..  Harvey....................           70058
 Regional Library.
Plaquemines Parish Library..............  8442 Highway 23...........  Belle Chasse..............           70037
St. Bernard Parish Library..............  1125 E St. Bernard Highway  Chalmette.................           70043
St. Martin Parish Library...............  201 Porter Street.........  St. Martinville...........           70582
Alex P. Allain Library..................  206 Iberia Street.........  Franklin..................           70538
Vermilion Parish Library................  405 E St. Victor Street...  Abbeville.................           70510
Martha Sowell Utley Memorial Library....  314 St. Mary Street.......  Thibodaux.................           70301
South Lafourche Public Library..........  16241 E Main Street.......  Cut Off...................           70345
Calcasieu Parish Public Library Central   301 W Claude Street.......  Lake Charles..............           70605
 Branch.
Iberia Parish Library...................  445 E Main Street.........  New Iberia................           70560
Mark Shirley, LSU AgCenter..............  1105 West Port Street.....  Abbeville.................           70510
----------------------------------------------------------------------------------------------------------------


FOR FURTHER INFORMATION CONTACT: Nanciann Regalado, via email at 
nanciann_regalado@fws.gov, via telephone at 678-296-6805, or via the 
Federal Relay Service at 800-877-8339.

SUPPLEMENTARY INFORMATION:

Introduction

    On April 20, 2010, the mobile offshore drilling unit Deepwater 
Horizon, which was being used to drill a well for BP Exploration and 
Production, Inc. (BP), in the Macondo prospect (Mississippi Canyon 252-
MC252), experienced a significant explosion, fire, and subsequent 
sinking in the Gulf of Mexico, resulting in an unprecedented volume of 
oil and other discharges from the rig and from the wellhead on the 
seabed. The DWH oil spill is the largest offshore oil spill in U.S. 
history, discharging millions of barrels of oil over a period of 87 
days. In addition, well over 1 million gallons of dispersants were 
applied to the waters of the spill area in an attempt to disperse the 
spilled oil. An undetermined amount of natural gas was also released 
into the environment as a result of the spill.
    The Trustees conducted the natural resource damage assessment 
(NRDA) for the DWH oil spill under the Oil Pollution Act 1990 (OPA; 33 
U.S.C. 2701 et seq.). Pursuant to OPA, Federal and State agencies act 
as trustees on behalf of the public to assess natural resource injuries 
and losses and to determine the actions required to compensate the 
public for those injuries and losses. The OPA further instructs the 
designated trustees to develop and implement a plan for the 
restoration, rehabilitation, replacement, or acquisition of the 
equivalent of the injured natural resources under their trusteeship to 
baseline (the resource quality and conditions that would exist if the 
spill had not occurred). This includes the loss of use and services 
provided by those resources from the time of injury until the 
completion of restoration.
    The DWH Trustees are:
     U.S. Department of the Interior (DOI), as represented by 
the National Park Service, U.S. Fish and Wildlife Service, and Bureau 
of Land Management;
     National Oceanic and Atmospheric Administration (NOAA), on 
behalf of the U.S. Department of Commerce;
     U.S. Department of Agriculture (USDA);
     U.S. Environmental Protection Agency (EPA);
     State of Louisiana Coastal Protection and Restoration 
Authority, Oil Spill Coordinator's Office, Department of Environmental 
Quality, Department of Wildlife and Fisheries, and Department of 
Natural Resources;
     State of Mississippi Department of Environmental Quality;
     State of Alabama Department of Conservation and Natural 
Resources and Geological Survey of Alabama;
     State of Florida Department of Environmental Protection 
and Fish and Wildlife Conservation Commission; and
     State of Texas: Texas Parks and Wildlife Department, Texas 
General Land Office, and Texas Commission on Environmental Quality.
    On April 4, 2016, the United States District Court for the Eastern 
District of Louisiana entered a Consent Decree resolving civil claims 
by the Trustees against BP arising from the DWH oil spill: United 
States v. BPXP et al., Civ. No. 10-4536, centralized in MDL 2179, In 
re: Oil Spill by the Oil Rig ``Deepwater Horizon'' in the Gulf of 
Mexico, on April 20, 2010 (E.D. La.) (http://www.justice.gov/enrd/deepwater-horizon). Pursuant to the Consent Decree, restoration 
projects in the Louisiana Restoration Area are chosen and managed by 
the LA TIG. The LA TIG is composed of the following Trustees: State of 
Louisiana Coastal Protection and Restoration Authority,

[[Page 10460]]

Oil Spill Coordinator's Office, Departments of Environmental Quality, 
Wildlife and Fisheries, and Natural Resources; DOI; NOAA; EPA; and 
USDA.

Background

    The Final PDARP/PEIS provides for TIGs to propose phasing 
restoration projects across multiple restoration plans. A TIG may 
propose in a draft restoration plan conceptual projects to fund for an 
information-gathering planning phase, such as E&D (phase 1). This 
allows TIGs to develop information needed to fully consider a 
subsequent implementation phase in a later restoration plan (phase 2). 
In the final Phase 1 RP #1, the LA TIG selected six conceptual projects 
for E&D, using funds from the wetlands, coastal and nearshore habitats; 
birds; and habitat projects on federally managed lands restoration 
types, as provided for in the DWH Consent Decree. Two of those projects 
that were selected for E&D in the final Phase I RP #1 are the Rabbit 
Island Restoration project (Rabbit Island project), under the birds 
restoration type, and the Shoreline Protection at Jean Lafitte 
Historical National Park and Preserve (Jean Lafitte project) under the 
habitat projects on federally managed lands restoration type. When E&D 
for those projects reached a stage where enough information was 
available to conduct OPA and NEPA analyses on the alternatives, a Phase 
2 plan was drafted. Notice of availability of the draft Phase 2 RP/EA 
#1.3 was published in the Federal Register on November 13, 2019 (84 FR 
61636). Public comment was encouraged and accepted until December 20, 
2019. The LA TIG hosted a public webinar on December 2, 2019, to 
facilitate public review and comment. The LA TIG considered the public 
comments received and finalized the Phase 2 RP/EA #1.3. A summary of 
the public comments received and the LA TIG's responses to those 
comments are presented in Section 7 of the final Phase 2 RP/EA #1.3.

Overview of the LA TIG Draft Phase 2 RP/EA #1.3

    The final Phase 2 RP/EA #1.3 is being released in accordance with 
OPA NRDA regulations found in the Code of Federal Regulations (CFR) at 
15 CFR part 990, NEPA and its implementing regulations found at 40 CFR 
parts 1500-1508, the Final PDARP/PEIS, and the Consent Decree. The 
Phase 2 RP/EA #1.3 provides OPA and NEPA analyses for a reasonable 
range of design alternatives for the Rabbit Island Restoration and Jean 
Lafitte Shoreline Restoration projects, and identifies the LA TIG's 
preferred design alternatives, those which the LA TIG believes best 
meet the objectives of the two projects. In accordance with NEPA, as 
part of the final Phase 2 RP/EA #1.3, the Trustees issued a FONSI. The 
FONSI is available in Appendix E of the Phase 2 RP/EA #1.3.
    The Rabbit Island Restoration project meets the goal of restoring 
and conserving birds by restoring 87.8 acres of the island's original 
200-acre footprint for bird habitat. This would be done by raising the 
elevation of Rabbit Island using dredged fill material from the 
Calcasieu Ship Channel as the borrow source area. Total cost for this 
project is approximately $15,600,000.
    The Jean Lafitte Shoreline Protection project implements a nearly 
continuous rock breakwater, with rock elbows protecting fish gaps along 
the eastern shorelines of Lake Cataouche, Lake Salvador, and Bayou 
Bardeaux in the Jean Lafitte National Historical Park and Preserve. 
Implementation is proposed in two increments, the northern and the 
southern portions of the project area. In the final Phase 2 RP/EA #1.3, 
the LA TIG approves to fund only the southern portion of the project at 
this time. The northern portion may be funded at a later date. Total 
cost for this project is approximately $20,448,500.

Administrative Record

    The documents comprising the Administrative Record for the Phase 2 
RP/EA #1.3 can be viewed electronically at https://www.doi.gov/deepwaterhorizon/adminrecord.

Authority

    The authority for this action is the Oil Pollution Act of 1990 (33 
U.S.C. 2701 et seq.), its implementing Natural Resource Damage 
Assessment regulations found at 15 CFR part 990, and the National 
Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and its 
implementing regulations found at 40 CFR parts 1500-1508.

Mary Josie Blanchard,
Department of the Interior, Director of Gulf of Mexico Restoration.
[FR Doc. 2020-03554 Filed 2-21-20; 8:45 am]
BILLING CODE 4333-15-P