[Federal Register Volume 85, Number 36 (Monday, February 24, 2020)] [Notices] [Pages 10458-10460] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 2020-03554] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF THE INTERIOR [FWS-R4-ES-2020-N014; FVHC98220410150-XXX-FF04H00000] Deepwater Horizon Oil Spill Final Restoration Plan #1.3 and Environmental Assessment: Rabbit Island Restoration and Shoreline Protection at Jean Lafitte Historical National Park and Preserve and Finding of No Significant Impact; Louisiana Trustee Implementation Group AGENCY: Department of the Interior. ACTION: Notice of availability. ----------------------------------------------------------------------- SUMMARY: In accordance with the Oil Pollution Act of 1990 (OPA), the National Environmental Policy Act of 1969 (NEPA), the Final Programmatic Damage Assessment Restoration Plan and Final Programmatic Environmental Impact Statement (Final PDARP/PEIS), and the Consent Decree, the Federal and [[Page 10459]] State natural resource trustee agencies for the Louisiana Trustee Implementation Group (LA TIG) have prepared the Louisiana Trustee Implementation Group Final Phase 2 Restoration Plan/Environmental Assessment #1.3:Rabbit Island Restoration and Shoreline Protection at Jean Lafitte Historical National Park and Preserve (Phase 2 RP/EA #1.3) and Finding of No Significant Impact (FONSI), approving construction activities for the restoration of habitats on federally managed lands and birds injured in the Louisiana Restoration Area as a result of the Deepwater Horizon (DWH) oil spill. The Phase 2 RP/EA #1.3 analyzes restoration project design alternatives for two projects, which were approved for engineering and design (E&D) in a previous restoration plan. In the final Phase 2 RP/EA #1.3, the LA TIG selected and approved a design alternative for construction of each, at a total approximate cost of $36,048,500. The purpose of this notice is to inform the public of the availability of the final Phase 2 RP/EA #1.3 and FONSI. ADDRESSES: Obtaining Documents: You may download the Phase 2 RP/EA #1.3 from either of the following websites:https://www.doi.gov/deepwaterhorizon. https://www.gulfspillrestoration.noaa.gov/restoration-areas/louisiana. Alternatively, you may request a CD of the Phase 2 RP/EA #1.3 (see FOR FURTHER INFORMATION CONTACT). A hard copy of the Phase 2 RP/EA #1.3 is also available for public review at the locations listed in the following table. ---------------------------------------------------------------------------------------------------------------- Library Address City Zip ---------------------------------------------------------------------------------------------------------------- St. Tammany Parish Library.............. 310 W 21st Avenue......... Covington................. 70433 Terrebonne Parish Library............... 151 Library Drive......... Houma..................... 70360 New Orleans Public Library, Louisiana 219 Loyola Avenue......... New Orleans............... 70112 Division. East Baton Rouge Parish Library......... 7711 Goodwood Boulevard... Baton Rouge............... 70806 Jefferson Parish Library, East Bank 4747 W Napoleon Avenue.... Metairie.................. 70001 Regional Library. Jefferson Parish Library, West Bank 2751 Manhattan Boulevard.. Harvey.................... 70058 Regional Library. Plaquemines Parish Library.............. 8442 Highway 23........... Belle Chasse.............. 70037 St. Bernard Parish Library.............. 1125 E St. Bernard Highway Chalmette................. 70043 St. Martin Parish Library............... 201 Porter Street......... St. Martinville........... 70582 Alex P. Allain Library.................. 206 Iberia Street......... Franklin.................. 70538 Vermilion Parish Library................ 405 E St. Victor Street... Abbeville................. 70510 Martha Sowell Utley Memorial Library.... 314 St. Mary Street....... Thibodaux................. 70301 South Lafourche Public Library.......... 16241 E Main Street....... Cut Off................... 70345 Calcasieu Parish Public Library Central 301 W Claude Street....... Lake Charles.............. 70605 Branch. Iberia Parish Library................... 445 E Main Street......... New Iberia................ 70560 Mark Shirley, LSU AgCenter.............. 1105 West Port Street..... Abbeville................. 70510 ---------------------------------------------------------------------------------------------------------------- FOR FURTHER INFORMATION CONTACT: Nanciann Regalado, via email at nanciann_regalado@fws.gov, via telephone at 678-296-6805, or via the Federal Relay Service at 800-877-8339. SUPPLEMENTARY INFORMATION: Introduction On April 20, 2010, the mobile offshore drilling unit Deepwater Horizon, which was being used to drill a well for BP Exploration and Production, Inc. (BP), in the Macondo prospect (Mississippi Canyon 252- MC252), experienced a significant explosion, fire, and subsequent sinking in the Gulf of Mexico, resulting in an unprecedented volume of oil and other discharges from the rig and from the wellhead on the seabed. The DWH oil spill is the largest offshore oil spill in U.S. history, discharging millions of barrels of oil over a period of 87 days. In addition, well over 1 million gallons of dispersants were applied to the waters of the spill area in an attempt to disperse the spilled oil. An undetermined amount of natural gas was also released into the environment as a result of the spill. The Trustees conducted the natural resource damage assessment (NRDA) for the DWH oil spill under the Oil Pollution Act 1990 (OPA; 33 U.S.C. 2701 et seq.). Pursuant to OPA, Federal and State agencies act as trustees on behalf of the public to assess natural resource injuries and losses and to determine the actions required to compensate the public for those injuries and losses. The OPA further instructs the designated trustees to develop and implement a plan for the restoration, rehabilitation, replacement, or acquisition of the equivalent of the injured natural resources under their trusteeship to baseline (the resource quality and conditions that would exist if the spill had not occurred). This includes the loss of use and services provided by those resources from the time of injury until the completion of restoration. The DWH Trustees are: U.S. Department of the Interior (DOI), as represented by the National Park Service, U.S. Fish and Wildlife Service, and Bureau of Land Management; National Oceanic and Atmospheric Administration (NOAA), on behalf of the U.S. Department of Commerce; U.S. Department of Agriculture (USDA); U.S. Environmental Protection Agency (EPA); State of Louisiana Coastal Protection and Restoration Authority, Oil Spill Coordinator's Office, Department of Environmental Quality, Department of Wildlife and Fisheries, and Department of Natural Resources; State of Mississippi Department of Environmental Quality; State of Alabama Department of Conservation and Natural Resources and Geological Survey of Alabama; State of Florida Department of Environmental Protection and Fish and Wildlife Conservation Commission; and State of Texas: Texas Parks and Wildlife Department, Texas General Land Office, and Texas Commission on Environmental Quality. On April 4, 2016, the United States District Court for the Eastern District of Louisiana entered a Consent Decree resolving civil claims by the Trustees against BP arising from the DWH oil spill: United States v. BPXP et al., Civ. No. 10-4536, centralized in MDL 2179, In re: Oil Spill by the Oil Rig ``Deepwater Horizon'' in the Gulf of Mexico, on April 20, 2010 (E.D. La.) (http://www.justice.gov/enrd/deepwater-horizon). Pursuant to the Consent Decree, restoration projects in the Louisiana Restoration Area are chosen and managed by the LA TIG. The LA TIG is composed of the following Trustees: State of Louisiana Coastal Protection and Restoration Authority, [[Page 10460]] Oil Spill Coordinator's Office, Departments of Environmental Quality, Wildlife and Fisheries, and Natural Resources; DOI; NOAA; EPA; and USDA. Background The Final PDARP/PEIS provides for TIGs to propose phasing restoration projects across multiple restoration plans. A TIG may propose in a draft restoration plan conceptual projects to fund for an information-gathering planning phase, such as E&D (phase 1). This allows TIGs to develop information needed to fully consider a subsequent implementation phase in a later restoration plan (phase 2). In the final Phase 1 RP #1, the LA TIG selected six conceptual projects for E&D, using funds from the wetlands, coastal and nearshore habitats; birds; and habitat projects on federally managed lands restoration types, as provided for in the DWH Consent Decree. Two of those projects that were selected for E&D in the final Phase I RP #1 are the Rabbit Island Restoration project (Rabbit Island project), under the birds restoration type, and the Shoreline Protection at Jean Lafitte Historical National Park and Preserve (Jean Lafitte project) under the habitat projects on federally managed lands restoration type. When E&D for those projects reached a stage where enough information was available to conduct OPA and NEPA analyses on the alternatives, a Phase 2 plan was drafted. Notice of availability of the draft Phase 2 RP/EA #1.3 was published in the Federal Register on November 13, 2019 (84 FR 61636). Public comment was encouraged and accepted until December 20, 2019. The LA TIG hosted a public webinar on December 2, 2019, to facilitate public review and comment. The LA TIG considered the public comments received and finalized the Phase 2 RP/EA #1.3. A summary of the public comments received and the LA TIG's responses to those comments are presented in Section 7 of the final Phase 2 RP/EA #1.3. Overview of the LA TIG Draft Phase 2 RP/EA #1.3 The final Phase 2 RP/EA #1.3 is being released in accordance with OPA NRDA regulations found in the Code of Federal Regulations (CFR) at 15 CFR part 990, NEPA and its implementing regulations found at 40 CFR parts 1500-1508, the Final PDARP/PEIS, and the Consent Decree. The Phase 2 RP/EA #1.3 provides OPA and NEPA analyses for a reasonable range of design alternatives for the Rabbit Island Restoration and Jean Lafitte Shoreline Restoration projects, and identifies the LA TIG's preferred design alternatives, those which the LA TIG believes best meet the objectives of the two projects. In accordance with NEPA, as part of the final Phase 2 RP/EA #1.3, the Trustees issued a FONSI. The FONSI is available in Appendix E of the Phase 2 RP/EA #1.3. The Rabbit Island Restoration project meets the goal of restoring and conserving birds by restoring 87.8 acres of the island's original 200-acre footprint for bird habitat. This would be done by raising the elevation of Rabbit Island using dredged fill material from the Calcasieu Ship Channel as the borrow source area. Total cost for this project is approximately $15,600,000. The Jean Lafitte Shoreline Protection project implements a nearly continuous rock breakwater, with rock elbows protecting fish gaps along the eastern shorelines of Lake Cataouche, Lake Salvador, and Bayou Bardeaux in the Jean Lafitte National Historical Park and Preserve. Implementation is proposed in two increments, the northern and the southern portions of the project area. In the final Phase 2 RP/EA #1.3, the LA TIG approves to fund only the southern portion of the project at this time. The northern portion may be funded at a later date. Total cost for this project is approximately $20,448,500. Administrative Record The documents comprising the Administrative Record for the Phase 2 RP/EA #1.3 can be viewed electronically at https://www.doi.gov/deepwaterhorizon/adminrecord. Authority The authority for this action is the Oil Pollution Act of 1990 (33 U.S.C. 2701 et seq.), its implementing Natural Resource Damage Assessment regulations found at 15 CFR part 990, and the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) and its implementing regulations found at 40 CFR parts 1500-1508. Mary Josie Blanchard, Department of the Interior, Director of Gulf of Mexico Restoration. [FR Doc. 2020-03554 Filed 2-21-20; 8:45 am] BILLING CODE 4333-15-P