About this Collection
This library collection includes documents relevant to Endangered Species Act Project Review and Consultation with the New England Field Office.
This collection includes documents to assist in project review as well as existing streamlined consultation letters. We will continually update this library collection and our project review process so check our website each time you are completing project review.
ESA Project Review Documents - Please follow our step-by-step project review process to utilize these documents.
- Species Determination Table
- Project Review Request Letter
Streamlined Consultation Letters - Please check our Streamlined Consultation Guidance (ADD ANCHORED LINK) before using these letters
- Letter for Telecommunication Projects
- Routine Highway Maintenance Projects
- 2016 EPA NPDES Small MS4 Permit Renewal Projects in MA and NH - Downloadable Consultation Letters
- Trail Maintenance Projects