05 November (Zones 1 and 2 to be initiated at same time) | 0600 | Winooski River River (Zone 1) (Winooski One Hydro Plant to Vermont Route 127) | Winooski, VT Burlington, VT Colchester, VT | 10.5 | TFM / Niclosamide | LIFTED | 11/8/2024 |
05 November (Zones 1 and 2 to be initiated at same time) | 0600 | Winooski River River and Lake (Zone 2) (Vermont Route 127 into Lake Advisory Area of Appletree Point to Colchester Point) | Burlington, VT Colchester, VT | 10.5 | TFM / Niclosamide | LIFTED | 11/11/2024 1200 (noon) |
13 November (Zones 1 and 2 to be initiated at same time) | 0630 | Missisquoi River River (Zone 1) (Swanton Dam to fork of Main Stem and Dead Creek) | Swanton, VT Highgate, VT | 7.8 | TFM | LIFTED | 11/15/2024 1200 (noon) |
13 November (Zones 1 and 2 to be initiated at same time) | 0630 | Missisquoi River River and Lake (Zone 2) (Fork of Main Stem and Dead Creek to Mouths) (Southeastern bay within Highgate to international border) | Highgate, VT | 7.8 | TFM | LIFTED | 11/20/2024 1200 (noon) |
14 November (To be initiated 24 hours after treatment begins) | 0630 | Missisquoi River Lake (Zone 3) (West branch mouth to west Swanton bridge and international border to Pike River) | Swanton, VT Municipality of Saint-Armand, QC | 7.8 | TFM | LIFTED | 11/20/2024 1200 (noon) |
SPRING 2025 (Zones 1 and 2 to be initiated at same time) | 0600 | Boquet River River (Zone 1) (Main Stem: Jersey Street Bridge to Mouth) (North Branch: Approximately 1.5 miles upstream to confluence with Main Stem) | Essex, NY Willsboro, NY | 8.4 | TFM | PENDING | PENDING |
SPRING 2025 (Zones 1 and 2 to be initiated at same time) | 0600 | Boquet River Lake (Zone 2) (0.5 miles north of mouth and 1.5 miles south) | Willsboro, NY | 8.4 | TFM | PENDING | PENDING |