Meramec Feasibility Study Restoration Design Notice

The U.S. Fish and Wildlife Service and Missouri Department of Natural Resources, in their role as Natural Resource Trustees, have prepared a notice that describes proposed restoration funding as in-kind match for Preconstruction Engineering and Design activities being conducted by the U.S. Army Corps of Engineers  as part of the Meramec River Ecosystem Restoration Feasibility Study. The Restoration Design Notice is available for public review and comment until May 26, 2023. Comments may be submitted via email to Dave Mosby, please use "Meramec FS PED Comments" in the subject line. Comments must be received by May 26, 2023 to be considered. 

Author(s)
Publication date
Program
A rocky shoreline of a river. The water is calm. Mist and green branches line the river.
The Ecological Services Program works to restore and protect healthy populations of fish, wildlife, and plants and the environments upon which they depend. Using the best available science, we work with federal, state, Tribal, local, and non-profit stakeholders, as well as private land owners, to...